HomeErosion controlReeds & reedbedsWetland management Aquatic plants Protected species Wildlife landscaping About usClient list Previous workLinksSite search

JPR Environmental
Breadstone
Business Centre,
Breadstone,
Berkeley, Gloucestershire
GL13 9HF

Tel: 01453 811 537
Fax: 01453 810 646
e-mail us

Reedbed filter construction
Case study - Reedbeds and management

Client The Wildfowl & Wetlands Trust, Slimbridge
Project period June - August 2001
Project outline An isolated public toilet block at WWT Slimbridge has the waste water running into a septic tank. A source of water was needed to keep a nearby wetland area damper for more of the year. This water was to be sourced from the septic tanks by being pumped into two parallel overland flow reedbeds to treat it, reducing the biological oxygen demand. The treated water can then be used in the Slimbridge grounds water system.
Services provided Construction of embankment, laying of butyl liner, infilling of the ponds with soil, installing the pipework, supply and planting of the reeds.
Photo

Reedbed filter, the Wildfowl & Wetlands Trust, Slimbridge

 

Click here for reed planting services we offer.

 

 

 

Erosion Control
Soft engineering solution to erosion control problems. More..

Reeds & reedbeds
Reed supply & reedbed design, creation and maintenance. More..

Protected species
Protected species habitat design, creation, maintenance & isolation. More..