Strengthening the bank of a mill pond in Painswick

HomeErosion controlReeds & reedbedsWetland management Aquatic plants Protected species Wildlife landscaping About usClient list Previous workLinksSite search

JPR Environmental
Breadstone
Business Centre,
Breadstone,
Berkeley, Gloucestershire
GL13 9HF

Tel: 01453 811 537
Fax: 01453 810 646
e-mail us

Bank revetment on a mill pond - Painswick, Gloucestershire
Client Private client
Project period May 2007
Project outline JPR Environmental installed coir rolls and reprofiled a bank that was eroding on a Mill Pond. Previous attempts to install a sleeper wall had failed. The client wanted the materials re-used where possible but also to raise and strengthen the bank where it was slipping. It was also necessary to shore up and extend the bank of a small island in the pond.
Services provided Any suitable sleepers were used to provide a firm base for the new bank. The new bank was built up using dead willow faggots and pre-planted coir rolls to the mean water level, fixed into position using 2m wooden stakes. This raised the bank by approximately 25cm and the area behind was then back filled with approximately 10 tons of topsoil to create a new profile and seeded with grass. All materials were carried to the work area to prevent vehicle damage to lawns etc.
Image

Coir rolls & bank re-profiling on Mill Pond

The new bank of the mill pond in Painswick before back filling

 

 

 

 

 

 

Erosion Control
Soft engineering solution to erosion control problems. More..

Reeds & reedbeds
Reed supply & reedbed design, creation and maintenance. More..

Protected species
Protected species habitat design, creation, maintenance & isolation. More..